| 137Cs air activity at NPP sites, μBq/m3 | 137Cs air activity limits, μBq/m3(NRBU-97) | EDR at NPP sites, in open areas, μSv/h |
ZNPP | * | 8000000 | 0.08 / 0.21** |
SUNPP | <0.64*** | 8000000 | 0.07 / 0.18 |
KhNPP | <1.21*** | 8000000 | 0.05 / 0.12 |
RNPP | 9.4 | 8000000 | 0.07 / 0.09 |
* data are not available due to the physical disconnection of the ZNPP data transmission systems by the russian occupationists
** data from the posts of the Automated Radiation Situation Monitoring System on the government-controlled territory. Data on the radiation situation in the temporarily occupied territory are published within the daily reports
*** below minimally detectable activity
Information on the radiation situation at NPP industrial sites and supervised areas as of 08:00 am on January 21, 2025
|
| Air emissions, % of emission limit | ||||
Industrial site | Sanitary protection zone | Supervised area | Radioactive inert gases | Long-lived radionuclides | Radioactive iodine | |
ZNPP | 0,13* | 0.11* | 0.12* | ** | ** | ** |
SUNPP | 0.10 | 0.08 | 0.09 | 0.06 | 0,010 | 0.002 |
KhNPP | 0.12 | 0.10 | 0.10 | 0.07 | 0.004 | 0.0008 |
RNPP | 0.09 | 0.09 | 0.09 | 0.19 | 0.03 | 0.0003 |
CSFSF | 0.17 | 0.36 | 0.17 | - | - | - |
* data was obtained from the IAEA IRMIS system on January 19, 2025
** data are not available due to the physical disconnection of the ZNPP data transmission systems by the russian occupationists
Information on the radiation situation at the sites of NPPs of JSC "NNEGC “Energoatom”
- Information on the radiation situation at the sites of NPPs of JSC "NNEGC “Energoatom” (current)
- Information on the radiation situation at the sites of NPPs of JSC "NNEGC “Energoatom” for 2022 - 2024
Information on the environmental impact caused by electricity production
- Information of SS “South Ukraine NPP” on the environmental impact caused by electricity production for 2023
- Information of SE “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-Dec 2023
- Information of JSC “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-Apr 2024
- Information of JSC “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-May 2024
- Information of JSC “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-July 2024
- Information of JCS “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-Aug 2024
- Information of JSC “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-Sep 2024
- Information of SE “NNEGC ”Energoatom" on the environmental impact caused by electricity production for Jan-Oct 2024
- Information of SS “South Ukraine NPP” on the environmental impact caused by electricity production for 2024