Repair and restoring the lines linking the ZNPP with the power system are required.
Plans to connect power units to the grid in conditions of shelling and damage to all lines are unrealistic.
Repair and restoring the lines linking the ZNPP with the power system are required.
Plans to connect power units to the grid in conditions of shelling and damage to all lines are unrealistic.
ZNPP news
Fires, shelling, problems with water supply for cooling ZNPP reactors – the occupiers pose a risk to nuclear safety in Europe
14 August 2025
ZNPP news
Nuclear safety and the return of the ZNPP to the control of Ukraine: the fifth conference, in continuation of the first Peace Summit, was held in Paris
21 October 2024
ZNPP news
The water level in the ZNPP cooling pond is stable
07 October 2024
ZNPP news
The civilized world remains united on the issue of returning ZNPP to Ukrainian control
14 July 2024