Energoatom Head Petro Kotin spoke about the results of the 2024-2025 heating season on the “Energo LIVE” program. According to him, the NPPs located in the territory controlled by Ukraine operated at full capacity, ensuring a capacity factor close to 100%.
Despite the constant threat of enemy shelling, the power units operated consistently. At the same time, in order to prepare for the next heating season, Energoatom has already begun a repair campaign.
More details about every aspect are provided in the video: