Currently, the ninth unit is loaded to 400 MW. After Ukrenergo lifts the restrictions on the output of power at this energy hub, it will be loaded up to a nominal capacity of 1,000 MW – and Ukraine will receive the full power of all NPP power units located on the territory controlled by the state.