07.10.2024
In winter, Ukraine needs maximum capacity of nuclear generation – all 9 power units at state-controlled NPPs should be in operation
Petro Kotin, CEO of JSC “NNEGC “Energoatom”, spoke about the completion of the repair campaign at nuclear power plants, preparations for the heating season, and expected electricity production amounts on the air of the “We Are Ukraine” TV channel.
Watch more in the video:
MORE NEWS
Energoatom CEO Petro Kotin congratulates Rivne NPP team on the 20th anniversary of the safe operation of RNPP power unit 4
10.10.2024
Energoatom successfully completed the maintenance campaign 2024 at NPPs
09.10.2024
russian Shahed drones again violated the no-fly zone around the South Ukraine NPP
08.10.2024
For the two years of operation of the Energoatom call center for advisory assistance, about 27,000 appeals have been processed
07.10.2024