22.05.2023
Zaporizhzhya NPP fed from Ukrainian power system again
![Broken image placeholder.](https://testtwo.energoatom.com.ua/media/images/photo-2205232.jpg)
Ukrainian professionals restored the operation of Dniprovska 750 kV high-voltage power transmission line, from which the temporarily occupied Zaporizhzhya nuclear power plant feeds its in-house needs.
The risk of a nuclear and radiation accident has been minimized, the situation is stable.
As a reminder, in the morning of May 22, at 5:26 am, due to ruscist terrorist shelling, this line was down. Since it was the last one powering the ZNPP, all backup diesel generators started operating automatically. As a result, the power plant experienced a blackout for the seventh time since the beginning of the occupation (March 4, 2022).
MORE NEWS
![](https://testtwo.energoatom.com.ua/media/images/zaesun1407.jpg)
The civilized world remains united on the issue of returning ZNPP to Ukrainian control
12.07.2024
![](https://testtwo.energoatom.com.ua/media/images/zaes160424_zti7rj9.jpg)
The Zaporizhzhia NPP must operate safely and securely under the full sovereign control of Ukraine
16.06.2024
![](https://testtwo.energoatom.com.ua/media/images/310525234kotin.jpg)
The Zaporizhzhia NPP will bring nothing but problems to the occupiers, - Petro Kotin
31.05.2024
![](https://testtwo.energoatom.com.ua/media/images/Photo6.png)
Energoatom is deploying employment programs for ZNPP employees
27.05.2024