23.05.2024
Ukrainian power industry specialists restored the power supply line of 750kV “Dniprovska” for ZNPP
On May 23, 2024 at 04:50 p.m. native power specialists could restore the operation of the damaged off-site overhead power line 750kV “Dniprovska”.
Thanks to their efforts, the temporarily occupied Zaporizhzhia NPP is connected to the unified energy system of Ukraine again by two power supply lines: 330 kV “Zaporizhzhia TPP — Ferosplavna” and “Dniprovska”, which provide power for the plant house load.
We will remind you that since the beginning of the Russian occupation, the Zaporizhzhya NPP has already experienced eight complete blackouts and one partial one - with the start of emergency diesel generators and safety systems. Their failure threatens with an emergency.
MORE NEWS
The Zaporizhzhia NPP must operate safely and securely under the full sovereign control of Ukraine
16.06.2024
The Zaporizhzhia NPP will bring nothing but problems to the occupiers, - Petro Kotin
31.05.2024
Energoatom is deploying employment programs for ZNPP employees
27.05.2024
The ZNPP is again on the verge of blackout: only one power supply line is working
23.05.2024