06.04.2024
Thanks to the efforts of the Ukrainian power industry specialists, the ZNPP has been connected to the second power line after the artillery shelling by the rascist occupiers
![](https://testtwo.energoatom.com.ua/media/images/wer5zaes.jpg)
Today, on April 6, at 06:09 p.m., the Ukrainian specialists has restored the operation of the 330kV off-site power supply line “Zaporizhzhia TPP — Ferosplavna”, which was under repair after shelling by the russian occupiers.
This line, together with the 750 kV line “Zaporizhzhia NPP — Dniprovska”, connects the plant to the unified energy system of Ukraine and provides power for its own needs.
We remind you that since the beginning of the russian occupation, the Zaporizhzhia NPP has already experienced eight complete blackouts and one partial one - with the start of emergency diesel generators and safety systems. Their refusal threatens with an emergency situation.
MORE NEWS
![](https://testtwo.energoatom.com.ua/media/images/zaes160424_zti7rj9.jpg)
The Zaporizhzhia NPP must operate safely and securely under the full sovereign control of Ukraine
16.06.2024
![](https://testtwo.energoatom.com.ua/media/images/310525234kotin.jpg)
The Zaporizhzhia NPP will bring nothing but problems to the occupiers, - Petro Kotin
31.05.2024
![](https://testtwo.energoatom.com.ua/media/images/Photo6.png)
Energoatom is deploying employment programs for ZNPP employees
27.05.2024
![](https://testtwo.energoatom.com.ua/media/images/zaes2305242.png)
Ukrainian power industry specialists restored the power supply line of 750kV “Dniprovska” for ZNPP
23.05.2024