06.04.2024
Thanks to the efforts of the Ukrainian power industry specialists, the ZNPP has been connected to the second power line after the artillery shelling by the rascist occupiers
Today, on April 6, at 06:09 p.m., the Ukrainian specialists has restored the operation of the 330kV off-site power supply line “Zaporizhzhia TPP — Ferosplavna”, which was under repair after shelling by the russian occupiers.
This line, together with the 750 kV line “Zaporizhzhia NPP — Dniprovska”, connects the plant to the unified energy system of Ukraine and provides power for its own needs.
We remind you that since the beginning of the russian occupation, the Zaporizhzhia NPP has already experienced eight complete blackouts and one partial one - with the start of emergency diesel generators and safety systems. Their refusal threatens with an emergency situation.
MORE NEWS
Nuclear safety and the return of the ZNPP to the control of Ukraine: the fifth conference, in continuation of the first Peace Summit, was held in Paris
21.10.2024
The water level in the ZNPP cooling pond is stable
07.10.2024
The civilized world remains united on the issue of returning ZNPP to Ukrainian control
12.07.2024
The Zaporizhzhia NPP must operate safely and securely under the full sovereign control of Ukraine
16.06.2024