The news is not available in English.
Go to all newsMORE NEWS
Repair campaign-2024! Energoatom is ready for the autumn and winter period
01.11.2024
100% readiness for the autumn and winter period: Energoatom has taken all the measures to operate all nine power units during the winter period
31.10.2024
State of nuclear generation in Ukraine and prospects for cooperation between Energoatom and the EU
29.10.2024
russian UAVs have posed a real threat to the safety of the Khmelnytskyi NPP
28.10.2024